Refit/Maintenance Details:
2022-2023:
• Total paint of the yacht (hull -superstructure) with dark grey metalliccolour
• New deck flooring in main saloon, wheelhouse area and galley andcrew mess
• New galley with CORIAN and new electrical appliances, custom made fridges and freezers and wine cooler.
• New saloon furniture and construction of a bar-outfitted with custom made ice maker and fridge.
• Renovation in guest area cabins (upholsteries-carpets-bathrooms)
• New crew mess area ( construction of an extra -cabin bed, refurbishment of kitchenette, new upholstery and flooring)
• New windows in main deck area – solar protection fime glasses
• Main deck aft veranda area, construction of two CORIAN benches withbuilt in BBQ, sink, fridge, ice maker.
• New mattresses and textiles (sunbeds, exteriors areas forward, aft andsun deck area) .
• New tents (aft, forward and sundeck)
• Reconstruction of forward garage door and overhauling of its hydraulic system
• Overhauling of aft garage door hydraulic system
• New lights (spots) main deck, lower deck and underwater
• Renovation of glass door (wheelhouse area)
• Total renovation of wheelhouse area (flooring, upholstery, new navigational equipment, camera’s + FLIR with night vision etc)
• General overhauling of bow and stern thruster
• Installation of HYDROTUB system (new flaps system)
• Propellers and shafts overhauling
• Generators, main engines and other machineries fully serviced
• New batteries
• General overhauling of water maker
• Forward and aft cranes as well as aft hydraulic pasarelle fully serviced.
• New side embarkation ladder
• New monitoring and fire detection system
• General renovation of teak deck
• New bed sheets, pillows, bath robes ,towels etc
• Water toys (one pair of skis, wakeboard, two tubes and 3p couch, one Seabob, one Jet ski, one Jet Surf, two SUP)
2018 :
• Wrapping of the hull with silver colour and blue stripe
• Wet-sand and polish all white superstructure
• Teak decking new
• Complete refit/refurbishment (upholstery, floorings, new furniture and renovation works in accommodation areas)
• Custom build all furnitures at the Sun deck
• New kitchen flooring
• New wheelhouse carpet
• Navigation equipment was replaced
• New audio visual system ( TVs, amplifiers,speakers, SONOS systemwith and assorted new wiring throughout the yacht)
• New power sockets
• New LED lighting throughout the yacht
• New walls
• New closets
• New Pullman beds
• Retro illuminated mirror ceiling in the middle of the saloon
• General overhauling of the following:
- Forward crane PIN CRAFT
- Aft boarding pasarelle
- Swimming ladder
- Windlasses with gear box and electric motor
- Aft capstans
• Replacement of all batteries
• General overhauling of existing water maker
• New led lighting/dimming system controlled |
|
670 Litres/Hr |
22 |
33 |